Most engineering disciplines accept that method follows from context. Nobody expects a bridge engineer, a documentary director and a trauma surgeon to share a planning model. Software is one of the few fields where people go looking for a single methodology and then try to apply it to everything in sight.
The useful question is not whether a project is Agile. It is where the team can learn by trying, and what must be known before a mistake reaches someone else.
The 2001 Agile Manifesto put working software and responding to change ahead of comprehensive documentation and following a plan. The point was not that plans or documentation are worthless. It was that when the shape of the work is uncertain, learning is part of building it.
Two questions
Project size does not answer the question. Ask instead: how much is still unknown, and what would it cost to discover a mistake late? Cost includes harm, money, the time it takes to get reliable feedback, and how hard a bad decision is to reverse. These are not a scoring formula; they are a way to make the constraints visible.
When uncertainty is high and mistakes are cheap to reverse, short iterations can test assumptions quickly. An experimental product or an internal tool can often learn from limited use and change course without putting much at stake.
When the cost of error is high and the requirements are reasonably clear, teams need stronger plans, checks and evidence before release. A defect in signalling or medical-device software is not an amusing way to find out that a requirement was wrong.
The difficult corner is high uncertainty and high consequence. It does not call for blind prediction: the unknowns still need to be explored. It calls for putting the learning loop somewhere safe. Teams can iterate with models, simulations, prototypes and controlled tests, then require enough evidence before the result reaches users or affects a live system.
That combination is possible in safety-critical work. The FDA recognises AAMI TIR45:2023, guidance on using Agile practices to develop medical-device software while complying with applicable standards and FDA guidance. NASA likewise says its software assurance and safety standard supports different life-cycle models, with its implementation adapted to the project’s context (NASA Software Engineering Handbook). That establishes that iteration and safety assurance can coexist; it does not show that every Agile practice suits every critical system.
At the other end, when both uncertainty and the cost of a mistake are low, a lightweight process may be enough. Between those corners, most work mixes anticipation with adaptation: a plan sets boundaries, and iterations reveal what the plan could not know.
So Agile and Waterfall are poor opposing camps. A social-media feature and a heart monitor do not prove rival philosophies; they show that teams have to learn in different places. The practical question is how much of a system we can afford to find out the hard way—and where we can learn safely instead.